Retroceder   .::Dreamsprojects::. > .::DMS::. Guest Downloads in English > Apps

Apps A place where you can share links to Windows applications.

Crear Nuevo Tema  Respuesta
 
LinkBack Herramientas Desplegado
Antiguo 26-jul-2010   #1 (permalink)
Dms Vip
 
Avatar de chip276

 
Mensajes: 307
Ingreso: julio-2010
Signo:
Pais:
Edad: 20
Total de Gracias: 0
26 Gracias en 25 Temas
Credibilidad: 0
chip276 is on a distinguished roadchip276 is on a distinguished roadchip276 is on a distinguished road
Puntos: 2.403, Nivel: 1
Puntos: 2.403, Nivel: 1 Puntos: 2.403, Nivel: 1 Puntos: 2.403, Nivel: 1
Nivel máximo: 99%, 0 Puntos
Nivel máximo: 99% Nivel máximo: 99% Nivel máximo: 99%
Actividad: 99%
Actividad: 99% Actividad: 99% Actividad: 99%
Predeterminado Overloud BREVERB STANDALONE VST RTAS 1.5.11 x86

Overloud BREVERB STANDALONE VST RTAS 1.5.11 x86


Overloud BREVERB STANDALONE VST RTAS 1.5.11 x86 | 17.37 MB

Breverb is a hi-end algorithmic reverberation plug-in that aims to faithfully recreate the sound of revered hardware reverbs while keeping CPU load very low. Breverb comprises four different algorithms, Hall, Room, Plate and Inverse, each one accurately modeled and engineered "with no compromises in sound quality". Breverb's no frills hardware-like user interface gives you immediate control over all of the parameters, allowing you to dynamically map parameters to six assignable controllers and to store, recall and automate presets in any way you want.

Features:

* 4 main Algorithms: Hall, Room, Plate and Inverse.
* Modeled after the most sought-after hardware units.
* Each Algorithm is engineered with no compromises in order to achieve maximum quality.
* Full EQ section to tailor Breverb frequency response.
* Extended Nonlinear section to forge reverberation shape.
* "Motion" controls to add liveness and musicality.
* Two different user interface modes: compact and hardware-like.
* Six fully assignable hardware-like faders.
* Full automation capability through host sequencers.
* Very low CPU usage: 80 stereo instances opened on a Pentium 4 3GHz processor.
* Host-sync of all rates and times.

Download :
Código:
http://www.fileserve.com/file/U9XbrWu/Overloud.BREVERB.STANDALONE.VST.RTAS.v1.5.11.x86-ASSiGN.rar
chip276 está desconectado   Responder Citando

5 Ultimos temas de chip276
Tema Foro Ultima Respuesta Respuestas Vistas Ultimo Post
Multi-BootAble DVD - Win7 WinXP HirensCD v10 More Apps chip276 0 25 18-ago-2010 15:41
Microsoft Office Enterprise 2010 Corporate (No serial, No... Apps chip276 0 30 18-ago-2010 15:04
Microsoft Office Blue Edition 2007 - Fully Activated Apps krlonghy 1 28 18-ago-2010 14:53
Microsoft Office 2010 X86 OEM Preinstallation Kit-CRBS Apps chip276 0 46 18-ago-2010 14:37
Microsoft Office 2010 Pro Plus (32bit & 64bit - NL - UK) ... Apps chip276 0 32 18-ago-2010 14:22


.::Marcadores::. Ayúdanos Es muy Fácil solo tienes que presionar la Red Social donde deseas Compartir.
Auspiciador Oficial de DreamsProjects
Respuesta

Etiquetas
breverb, overloud, rtas, standalone, vst, x86


(0 miembros y 1 visitantes)
 
Herramientas
Desplegado

Normas de Publicación
No puedes crear nuevos temas
No puedes responder mensajes
No puedes subir archivos adjuntos
No puedes editar tus mensajes

Los Códigos BB están Activado
Las Caritas están Activado
[IMG] está Activado
El Código HTML está Desactivado
Trackbacks are Activado
Pingbacks are Activado
Refbacks are Activado



La franja horaria es GMT. Ahora son las 16:11.


Powered by : vBulletin® Versión 3.8.3
Copyright ©2000 - 2010, Jelsoft Enterprises Ltd.
Traducido por mcloud de vBsoporte.com
2007 - 2011 © Dreamsprojects.com No se hace Responsable por el material publicado por sus usuario.